Schleuse Pinnow

Navinfo near Oranienburg

Last edited 15.04.2024 at 09:12 by NV Charts Team

Latitude

52° 43’ 1.8” N

Longitude

13° 14’ 15.3” E

Information

L 43.2 m / W 9.6 m / Lift 2.1 m

During longer periods of drought, very little water is available in the Oranienburg Canal. Only a few collective sluices are then carried out per day (max. 3).

Operating hours

In the period from 01.05. to 30.09. locks are only possible on Friday, Saturday, Sunday and public holidays at fixed times (downhill 07.30 h / 12.30 h / 17.30 h and uphill 08.00 h / 13.00 h / 18.00 h

01.01. - 31.03. Only on Request
01.04. - 30.04. Mon-Fri 08:00 - 08:45 Sat-Sun no operation
01.05. - 30.09. Mon-Thu 08:00 - 08:45 + 14:00 - 14:45 Fri-Sun only fixed times (see above)
01.10. - 31.10. Mon-Fri 08:00 - 08:45 Sat- Sun no operation
01.11. - 31.12. Only on Request

Affected NV Charts: NV Binnen 2 HOW3, p.14

Dated: 11.03.2021

Comments

Carsten, Anne
Derzeit nur 2 Schleusungen in der Woche wegen Bauarbeiten, Mo 08:00 Uhr und Freitags 11:00 Uhr. Gilt bis 27 KW. Siehe www.wsa-oder-havel.wsv.de
21.06.2022 10:54
Nico
08.08.2021 21:29
Christoph Kowal, CJK
07.05.2021 16:30

You can add comments with the NV Charts App (Windows - iOS - Android - Mac OSX).
You can download the current version at nvcharts.com/app.

Buy nv charts covering this place Clicking one of the products will open the nv charts shop.

Places nearby